Fig. 1 Bodies in contact with each other

  

 

 

Fig.2 Frame for calculation of the contact force

 

Fig. 3 Local contact search algorithm

 

Fig. 4 The geometry and mesh of tube and tubesheet structure analyzed

 

 

 

Fig. 5 Average CPU time vs. numbers of contact nodes

 


 

 

Water (600 mm)

 

 

Dimensions: 20038 x 51 x 600  

Loading condition: gravity force + hydraulic pressure

 

Fig. 6 The Northeast fault model with the Pacific plate analyzed


 

 

 

 

(a)

 

 

 

(b)

 

 

 

(c)

 

Fig. 7 Displacement distribution at different friction conditions:

(a). ; (b).;

 (c). , otherwise