Replied: Mon, 05 Mar 2001 15:43:01 -0500 Replied: "Sandy Hall" Replied: Joe Travis Replied: "Gordon Erlebacher" Replied: Mon, 05 Mar 2001 12:58:59 -0500 Replied: "Sandy Hall" Return-Path: hall@stat.fsu.edu Return-Path: Delivered-To: fox@csit.fsu.edu Received: from stat.fsu.edu (stat.fsu.edu [128.186.4.10]) by mailer.csit.fsu.edu (Postfix) with ESMTP id 3A55D23A0E for ; Mon, 5 Mar 2001 12:38:14 -0500 (EST) Received: from sristat (sristat.magnet.fsu.edu [146.201.226.252]) by stat.fsu.edu (8.9.3/8.9.3) with SMTP id MAA22297 for ; Mon, 5 Mar 2001 12:38:04 -0500 (EST) Message-ID: <004d01c0a59c$2273ceb0$fce2c992@sristat> From: "Sandy Hall" To: Subject: computational question Date: Mon, 5 Mar 2001 12:45:27 -0500 MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_NextPart_000_0048_01C0A572.278DC0B0" X-Priority: 3 X-MSMail-Priority: Normal X-Mailer: Microsoft Outlook Express 5.50.4133.2400 X-MimeOLE: Produced By Microsoft MimeOLE V5.50.4133.2400 This is a multi-part message in MIME format. ------=_NextPart_000_0048_01C0A572.278DC0B0 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable I am a graduate student in the statistics department. For one of my = courses, I am running a highly computationally intensive Matlab program. = It currently takes 9-10 hours when our sample size is 1000 and the = number of iterations is 200. I need to up my number of iterations to = about 1000 or so. This would up the running time to about 50 hours or = so using the system in the stats department. I asked Dr. Travis whom I = needed to contact and he suggested you. I was wondering where I could = run this program in order to speed it up. Please let me know any advice = that you have. Thanks for your help in this matter. Sandy Hall ------=_NextPart_000_0048_01C0A572.278DC0B0 Content-Type: text/html; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable
I am a graduate student in the = statistics=20 department.  For one of my courses, I am running a highly = computationally=20 intensive Matlab program.  It currently takes 9-10 hours when our = sample=20 size is 1000 and the number of iterations is 200.  I need to up my = number=20 of iterations to about 1000 or so.  This would up the running time = to about=20 50 hours or so using the system in the stats department.  I asked = Dr.=20 Travis whom I needed to contact and he suggested you.  I was = wondering=20 where I could run this program in order to speed it up.  Please let = me know=20 any advice that you have.
 
Thanks for your help in this = matter.
 
Sandy Hall
------=_NextPart_000_0048_01C0A572.278DC0B0--