1 | Data partitioning must be very carefully designed to balance I/O and CPU |
2 | Parallel Loading is great ! --- almost linear speedup |
3 | Backup may be important to save time (we don't have) |
4 | The most difficult and trouble-making phase is the database preparation/loading/indexing phase which always involves storage management parameters |
5 | you must be both a DBA and sysadm and benchmarking relies critically on system stability |
6 | Be prepared to bring down the whole parallel system a couple of times a day |
7 | Be prepared that the results are negative (nothing may be obtained !) |
8 | you need at least twice the disk space of your original database size |
9 | performance tuning is extremely difficult with Oracle 7 parallel server |