Full HTML for

Basic foilset Schedule of Gateway Meeting and Project Structure

Given by Dana Hoffman and Bill Asbury at ASC Gateway Project Dayton Ohio on January 7 1999. Foils prepared January 31 1999
Outside Index Summary of Material


This is one of a set of presentations for a meeting at Dayton for ASC MSRC on Seamless Interface or Gateway Project
This was a two day meeting truncated to the first day due to bad weather
This talk describes two items
  • The Meeting Structure (with second day cancelled and Netsolve talk moved to day one)
  • Overall Project Framework

Table of Contents for full HTML of Schedule of Gateway Meeting and Project Structure

Denote Foils where Image Critical
Denote Foils where HTML is sufficient

1 IPSE/Gateway Kick-Off Meeting Jan. 7-8,1999
2 IPSE/Gateway Kick-Off
3 IPSE/Gateway Kick-Off
4 Primary Goals -- Day 1
5 Functional Organization
6 Top-Level Requirements
7 PPT Slide
8 PPT Slide
9 PPT Slide
10 PPT Slide
11 PPT Slide
12 PPT Slide

Outside Index Summary of Material



HTML version of Basic Foils prepared January 31 1999

Foil 1 IPSE/Gateway Kick-Off Meeting Jan. 7-8,1999

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
Day 1 - ASC/MSRC Team Reviews, Discussions & Summary
Day 2 - AM, Review Related Technologies, ASC Summary
- PM, Working Group(s) TBD for potential Collaborations
MAJOR OBJECTIVES:
-Review/Coordinate Current Efforts Already Underway
-Review both Proposed and Planned Efforts
-Review ASC's Requirements (environment, test, sustainment, etc.)
-Develop an ASC IPSE Summary Plan for Future Delivery Phases
-Investigate Potential Collaborations and Incorporate, if Feasible

HTML version of Basic Foils prepared January 31 1999

Foil 2 IPSE/Gateway Kick-Off

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
Agenda: Day 1
  • 9:00 am -- Opening & Review Current Efforts at the ASC MSRC
    • CEN (Dr. Paul Sotirelis)
    • CCM (Dr. Ken Flurchick)
    • CEA (Dr. John Nehrbass)
  • 10:30 am -- Break
  • 10:45 am -- ASC Preliminary Requirements (Bill Asbury)
  • 11:15 am -- Syracuse Middleware Proposal (Dr. Geoffrey Fox)
  • 12:00 pm -- Lunch
  • 1:00 pm -- Open Discussion and Planning Session
  • 3:15 pm -- Wrap-up & Summary Development

HTML version of Basic Foils prepared January 31 1999

Foil 3 IPSE/Gateway Kick-Off

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
Agenda: Day 2
  • 9:00 am -- Review Current Efforts
    • NetSolve (Dr. Shirley Brown)
    • Teraweb (TBD)
  • 11:00 am -- IPSE/Gateway Summary Plan (Day 1) for ASC (Dr. Geoffrey Fox)
  • 12:00 pm -- Lunch
  • 1:00 pm -- Working Group(s) TBD
  • 4:00 pm -- Wrap-up &Final Summary Development

HTML version of Basic Foils prepared January 31 1999

Foil 4 Primary Goals -- Day 1

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
Obtain detailed understanding of middleware design and functionality as applied to the ASC MSRC environment.
Develop design/prototype milestones and system requirements.
Begin definition of detailed requirements, objects, and interfaces to establish a flexible, scalable framework, which conforms to emerging national standards.
Understand the sustainment/maintenance impact of the middleware and PSEs.
Identify training issues for middleware interface development.
Produce a complete & concise summary of these discussions.

HTML version of Basic Foils prepared January 31 1999

Foil 5 Functional Organization

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index

HTML version of Basic Foils prepared January 31 1999

Foil 6 Top-Level Requirements

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
User Interface Requirements
Responsive to User
CTA Independent
Kerberos/SecurID Authentication
Interactive/Batch Jobs
Import/Export of Data Files
Tool/Data/Information Facilities
"Out" for Advanced Users
Multi-disciplinary Capability
Browser/Web Server Independent
Middleware Requirements
Modular Design
Low Maintenance
Batch System Independent
HPC Platform Independent
Mass Storage Independent
Job Accounting/Allocation Compatible
Compliant with Emerging National Standards
Consistent with MetaComputing
Reliance on Standards is Key for IPSE Design and Implementation Efforts.

HTML version of Basic Foils prepared January 31 1999

Foil 7 PPT Slide

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
Phase II IPSE
Phase I IPSE
Phase III IPSE
Goal
1 Year
2 Years
3 Years
Provide Superior
Service to the DoD User
(Customer Focused)
Testbed Setup
PBS Web Interface
Kerberos/SecurID
Secure
Prototype
Incorporate Multiple
CTAs
Expand Functionality
Detailed Design
Implementation
Full Multidisciplinary
Capability

HTML version of Basic Foils prepared January 31 1999

Foil 8 PPT Slide

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
Proof of Concept

HTML version of Basic Foils prepared January 31 1999

Foil 9 PPT Slide

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
ASC MSRC Testbed
Winterhawk SP
2 Node/4 Proc
Regatta
1 Node/4 Proc
IBM SP
2 Node/2 Proc
O 200
Workstations -
SGI, IBM, SUN
Jan
Feb
Mar
Apr
May

HTML version of Basic Foils prepared January 31 1999

Foil 10 PPT Slide

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index
Prototype Development
Jan
Mar
May
Jul
Sept
Prototype Planning
Prototyping
In-House
Demo
SC99
IPSE Detailed Design
Complete Testbed

HTML version of Basic Foils prepared January 31 1999

Foil 11 PPT Slide

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index

HTML version of Basic Foils prepared January 31 1999

Foil 12 PPT Slide

From Schedule of Gateway Meeting and Project Structure ASC Gateway Project Dayton Ohio -- January 7 1999. *
Full HTML Index

© Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu

If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.

Page produced by wwwfoil on Sun Jan 31 1999