Basic HTML version of Foils prepared Aug 21 99

Foil 10 The Gateway PSE

From CCM and General Gateway PSE ASC Gateway Project Review Wright Technology Network Dayton -- July 22 99. by Ken Flurchick (OSC)


1 Page 10
2 Plans : Problem Description
3 Problem Description
4 Tools to develop and maintain problem description supporting
5 material will be specified and developed. This problem description
6 material includes discussions on methods, accuracy, and so on.
7 Initial object specification: 8/15/99, tools available: 9/15/99.
8 The current framework of the Problem Descriptor needs to
9 incorporate all the relevant scientific components and be
10 extensible. 9/15/99 is a target for CCM and 9/30 for a compilation
11 of discussions with other CTA's
12 The problem to codes and code to resources process is under
13 discussion. (TBD)
14 Plans include the development of tools based on experience
15 constructing the mappings above. (TBD)

in Table To:


© Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu

If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.

Page produced by wwwfoil on Sat Aug 21 1999