Basic HTML version of Foils prepared Aug 21 99

Foil 14 The Gateway PSE

From CCM and General Gateway PSE ASC Gateway Project Review Wright Technology Network Dayton -- July 22 99. by Ken Flurchick (OSC)


1 Tasks : Results Toolbox
2 Results Toolbox
3 CTA specific analysis of the results. The immediate goal is to
4 provide the user with sufficient information to determine that
5 the job ran successfully.
6 Provide access to tools for detailed analysis, such as code
7 specific visualization or general visualization tools.
8 Tools to develop and maintain analysis tools and links to
9 external applications.
10 Page 14

in Table To:


© Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu

If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.

Page produced by wwwfoil on Sat Aug 21 1999