Foil 17 The Gateway PSE

From CCM and General Gateway PSE ASC Gateway Project Review Wright Technology Network Dayton -- July 22 99. by Ken Flurchick (OSC)


1 Plans : Summary
2 Page 17
3 Entry
4 PSE requirements for entry. Complete entry requirements and implementation by 8/31/99.
5 A complete list of middle tier services to be specified by 9/1/99.
6 State information will be specified by 8/15/99.
7 Storage and retrieval of state information discussion is to be scheduled.
8 The PSE navigator will link to PSE components. There are many technical issues to resolve. Target is 8/31/99.
9 Problem Description
10 Tools to develop and maintain problem description supporting material. Initial object specification 8/15/99 and tools available 9/15/99.
11 The current framework of the Problem Descriptor for CCM is available 9/15/99 and a compilation of discussions with other CTA's is available 9/30.
12 The problem to codes and code to resources is under discussion. (TBD)
13 The development of tools to provide the mappings above. (TBD)

in Table To:


© Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu

If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.

Page produced by wwwfoil on Sat Aug 21 1999