Development Issues
Visualization
- Perform some tests in order to determine the best terrain chunk
sizes--a couple of days
- concurrent data fetch, using sproc call. How much can we get out
of it?--1 month
- data preparation. DEMs are in 1 degree chunks. We need to create
a file-system of images (both maps and satellite), locked, because
of texture mapping hardware requirements not bigger than 512x512
pixels (depending on scale 15 or 7.5 minutes)--a student, 4-6
weeks at most
I think it is useful to prepare several sets of satellite
images (2-3), with bright colors (use some algorithms from
ERMapper, eg. vegetation, Fe concentration, etc)
- cache system improvements--2 weeks
- a consistent gui, based on SGI's motif--2-3 weeks
- determination of system's computation/graphics power at
startup--1 week
- multiwindow mode on one side--1 month
Database Support
Database content is going to be prepared by Deepak.
- clickable links/database information retrieval--2 weeks
- spatial queries, based on GUI--1 month
- authoring tool--lower priority, 2-3 weeks
Weather Visualization
- moving the system to geo-referenced space--a couple of days
- development of new filters (contours, isosurfaces)--2 weeks
- colormap editing tool--1 week