Basic HTML version of Foils prepared January 8 98

Foil 8 Launching the Alliance - What We Will Do This Fall

From NCSA Alliance Overview Used by Fox in Presentations 27 Dec 97 to 5 Jan 98 -- January 5 98. by Larry Smarr


1 Infrastructure Foundations
  • Build the Alliance Intranet Framework
    • Create the Origin Repository
    • Rough Out Intranet Interfaces
  • Set up the High Performance Networks
    • Link the CAVE Devices
2 Define the Alliance Work Plan
  • Timelines and Deliverables for First Year
    • Interweaving of ET/AT/EOT/RP and NCSA
    • Identifiy Early Success Goals
  • Define Alliance Software Set for AT/EOT
    • Review Alliance Collaborative Software Plans
    • Requires Strong ET/AT/EOT Brainstorming

in Table To:


© Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu

If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.

Page produced by wwwfoil on Thu Jan 8 1998