ASOP is Affordable Systems Optimization Process |
This project involves MADIC Team 2
|
This Presentation was developed to describe initial findings of NASA Contract to investigate:
|
001 Implementation of Affordable Systems Optimization Process (ASOP) on the NII - 002 Presentation Agenda 003 Requirements Definition Team 004 Requirements Definition Process 005 Key Briefing Points 006 Presentation Agenda 007 Cost is the Major Technology Challenge 008 Life Cycle Cost is a Design Variable in ASOP 009 NII Enhances ASOP in a Multi-Organization Activity 010 Industrial/Academic/Government Consensus is ASOP Basis 011 Testbed Development is a NASA Role in ASOP 012 ASOP Introduces Aerospace Paradigm Shifts 013 ASOP Criticality to Aerospace Industry and NASA 014 Presentation Agenda 015 1.0 ASOP Design Environment 016 1.1 Design Engine 017 1.2 Visualization Toolkit 018 1.3 Geometry Toolkit 019 1.4 Analysis Modeling Toolkit 020 1.5 Cost Model Toolkit 021 1.6 Process Modeling Toolkit 022 1.7 Simulation Engine 023 1.8 Optimization Engine 024 2.0 ASOP Object Backplane - Integration Services to Users 025 2.1-2.5 ASOP Object Backplane Leverages NII 026 3.0 and 4.0 Team Infrastructure 027 5.0 and 6.0 NII Infrastructure 028 ASOP Framework Supports Technology Development 029 Presentation Agenda 030 Four Phase Demonstration of ASOP Testbed on NII 031 Phase 1 ASOP Requirements Defined 032 Phase 2 Wing Demonstration Completed in Six Months 033 Rockwell Specific ASOP Implementation - Phase 2 034 Market Parameter LCC Traded Against System Performance 035 NII Infrastructure Idealized for Phase 2 Wing Demonstration 036 Phase 3 ASOP Preliminary Design Validates Security 037 Phase 3 Implements "Best" NII Technology for ASOP 038 Phase 2 Engine Disk Motivation 039 Phase 2 Engine Detailed Disk Design & Manufacturing 040 Phase 2 Implementation Framework - Engineous 041 Phase 3 Engine Design & Manufacturing 042 Phase 3 Engine Design Leveraging NPSS 043 Phase 4 ASOP Testbed on NII for Process Improvement 044 Phase 4 Aircraft IPPD Demo Fully Implements ASOP Testbed 045 Technology Roadmap Constructed for WBS Elements 046 Four Phase Demonstration of ASOP Testbed on NII 047 Presentation Agenda 048 Conclusions 049 Recommendations