Basic HTML version of Foils prepared 8 January 98

Foil 12 Launching the Alliance - What We Will Do This Fall

From General NPAC Foils-B starting June97(PowerPoint) Beijing and Chang Sha China -- 28 Dec 97 to 5 Jan 98. by Geoffrey C. Fox


1 Infrastructure Foundations
  • Build the Alliance Intranet Framework
    • Create the Origin Repository
    • Rough Out Intranet Interfaces
  • Set up the High Performance Networks
    • Link the CAVE Devices
2 Define the Alliance Work Plan
  • Timelines and Deliverables for First Year
    • Interweaving of ET/AT/EOT/RP and NCSA
    • Identifiy Early Success Goals
  • Define Alliance Software Set for AT/EOT
    • Review Alliance Collaborative Software Plans
    • Requires Strong ET/AT/EOT Brainstorming

in Table To:


© Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu

If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.

Page produced by wwwfoil on Fri Jan 9 1998