Basic HTML version of Foils prepared 8 January 98

Foil 40 II. Major Findings & Recommendations: Recommendations

From General NPAC Foils-B starting June97(PowerPoint) Beijing and Chang Sha China -- 28 Dec 97 to 5 Jan 98. by Geoffrey C. Fox


1 Conduct point design studies.
  • in hardware and software.
  • of promising architecture
2 Develop engineering prototypes.
  • Multiple technology track demonstrations
3 Start SW now, independent of HW.
4 Develop layered software architecture for scalability and code reuse
5 Explore algorithms for special purpose & reconfigurable structures.

in Table To:


© Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu

If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.

Page produced by wwwfoil on Fri Jan 9 1998