HELP! * GREY=local Full HTML for

LOCAL foilset Collaborative and Interactive Visualization Project Leskiw Electromagnetic and C3 Application Foils

Given by Don Leskiw at Kickoff Meeting at NPAC on October 17,1995. Foils prepared October 17,1995
Abstract * Foil Index for this file

Foils Prepared by Don Leskiw for Kick Off Meeting on October 17,1995
Cover Electromagnetic Scattering (Rome Laboratory SBIR with Ultra)
and Command and Control (JWID)

Table of Contents for full HTML of Collaborative and Interactive Visualization Project Leskiw Electromagnetic and C3 Application Foils


1 Joint/Coalition C2 System Status
2 Electromagnetic Scattering Simulation System
3 C3 Concept Development Goals

This table of Contents Abstract



HELP! * GREY=local HTML version of LOCAL Foils prepared October 17,1995

Foil 1 Joint/Coalition C2 System Status

From Collaborative and Interactive Visualization Project Leskiw Foils Kickoff Meeting at NPAC -- October 17,1995. * Important Information in IMAGE
Full HTML Index
Reviewed JWID-95 and C4I for the Warrior; also JWID-96 plans and Smart Push/Warrior Pull working group report
Reviewed Fort Franklin III
Now need to identify specific C3I missions and functions for RL support
Presently investigating DMA databases and formats

HELP! * GREY=local HTML version of LOCAL Foils prepared October 17,1995

Foil 2 Electromagnetic Scattering Simulation System

From Collaborative and Interactive Visualization Project Leskiw Foils Kickoff Meeting at NPAC -- October 17,1995. * See also color IMAGE
Full HTML Index
Goal: Development of electromagnetic simulation for C3I missions and functions
Have reviewed GEMACS (D. Leskiw of Ultra - note: GEMACS is RL software, but restricted access)
Now need to define electromagnetic simulation demonstration and integration requirements for C3I

HELP! * GREY=local HTML version of LOCAL Foils prepared October 17,1995

Foil 3 C3 Concept Development Goals

From Collaborative and Interactive Visualization Project Leskiw Foils Kickoff Meeting at NPAC -- October 17,1995. * See also color IMAGE
Full HTML Index
Identify key C3 concepts and objectives
Ensure consistency with other tasks
Incorporate existing service requirements or technology needs analysis
Provide concept and application demonstrations
Support involvement in exercises i.e., Joint Warrior Interoperability Demonstration

Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu

If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.

Page produced by wwwfoil on Mon Feb 17 1997