Given by Don Leskiw at Kickoff Meeting at NPAC on October 17,1995. Foils prepared October 17,1995
Abstract * Foil Index for this file
Foils Prepared by Don Leskiw for Kick Off Meeting on October 17,1995 |
Cover Electromagnetic Scattering (Rome Laboratory SBIR with Ultra) |
and Command and Control (JWID) |
This table of Contents
Abstract
Reviewed JWID-95 and C4I for the Warrior; also JWID-96 plans and Smart Push/Warrior Pull working group report |
Reviewed Fort Franklin III |
Now need to identify specific C3I missions and functions for RL support |
Presently investigating DMA databases and formats |
Goal: Development of electromagnetic simulation for C3I missions and functions |
Have reviewed GEMACS (D. Leskiw of Ultra - note: GEMACS is RL software, but restricted access) |
Now need to define electromagnetic simulation demonstration and integration requirements for C3I |
Identify key C3 concepts and objectives |
Ensure consistency with other tasks |
Incorporate existing service requirements or technology needs analysis |
Provide concept and application demonstrations |
Support involvement in exercises i.e., Joint Warrior Interoperability Demonstration |