Page 10 |
Plans : Problem Description |
Problem Description |
Tools to develop and maintain problem description supporting |
material will be specified and developed. This problem description |
material includes discussions on methods, accuracy, and so on. |
Initial object specification: 8/15/99, tools available: 9/15/99. |
The current framework of the Problem Descriptor needs to |
incorporate all the relevant scientific components and be |
extensible. 9/15/99 is a target for CCM and 9/30 for a compilation |
of discussions with other CTA's |
The problem to codes and code to resources process is under |
discussion. (TBD) |
Plans include the development of tools based on experience |
constructing the mappings above. (TBD) |