Basic IMAGE version of Foils prepared Sept 19, 1996
Foil 24 V. A National program concept: Basis
From PetaFlop(JNAC) Overview Presentations -- Results of Studies and Next Steps Sep 19,96 NSTC Committee Presentation -- Sept 19,1996. byPaul Smith DoE Northeast Parallel Architectures Center, Syracuse University, npac@npac.syr.edu If you have any comments about this server, send e-mail to webmaster@npac.syr.edu.
1
NSTC/Committee on Computing, Information & Communication Meeting PetaFLOPS Workshops Results September 19, 1996 Dr. Paul H. Smith Department of Energy 2
Contents 3
I. Workshop series... background: PetaFLOPS workshops. 4
I. Workshop series... background: Community & Sponsoring Agencies 5
I. Workshop series... background: Workshops Purposes 6
Title of foil 6 7
Title of foil 7 8
II. Major Findings & Recommendations: Findings. 9
II. Major Findings & Recommendations: Findings. 10
II. Major Findings & Recommendations: Recommendations 11
II. Major Findings & Recommendations: Recommendations 12
PP Presentation 13
III. Key drivers for advanced computational capabilities beyond HPCC. Why PetaFLOPS?? 14
III. Key drivers: The State of the Art 15
III. Key drivers: The Need for PetaFLOPS Computing 16
III. Key drivers: Broad-Scale Applications 17
III. Key drivers: Technological Limitations 18
III. Key drivers: Summary 19
IV. Architecture Point Designs & SW Design Studies: Point Design Study: 20
IV. Architecture Point Designs & SW Design Studies: 1996 Point Design Awards 21
IV. Architecture Point Designs & SW Design Studies: Architectural Framework 22
IV. Architecture Point Designs & SW Design Studies: Key SW Development Areas 23
IV. Architecture Point Designs & SW Design Studies: Software Implementation Strategy 24
V. A National program concept: Basis 25
V. A National program concept: Scope & Strategy 26
V. A National program concept: Technology Projection Model 27
V. A National program concept: Structure & Flow 28
V. A National program concept: Technology Model 29
V. A National program concept: Research Projects - Technology 30
V. A National program concept: Research Projects - Architecture 31
V. A National program concept: Research Projects - System Software 32
V. A National program concept: Research Projects - Applications & Algorithms 33
V. A National focused program concept: Early Program Milestones 34
VI. Future actions necessary to mold an R&D program: The Message 35
VI. Future actions necessary to mold an R&D program: Near Term Recommendation 36
VI. Future actions necessary to mold an R&D program: Next Steps 37
VI. Future actions necessary to mold an R&D program: PetaFLOPS Algorithms Workshop (PAL`97) 38
VI. Future actions : Next Steps Integrate into Federal R&D Planning
Click outside pointer rectangle to move pointer
Click on Pointer to Hide
Click on Pointer + ALT to toggle message hiding
Click on Pointer + CNTL to abolish pointer
Click on Pointer + Shift to cycle families
Click outside + Alt is Change Image
Click outside + Control is Double Size
Click outside + Shift is Halve Size
Right Mouse Down on Pointer Toggles Index
Shift Right Mouse aligns top with scrolled Page While With Mouse Down on Current Pointer h hides This Message while m restores i Toggles Index Aligned with Page Top j Toggles Index Aligned with Scrolled View Top a Abolishes Pointer while CNTL-Click restores f cycles through pointer families c cycles through members of a family u increases Size Up and d decreases Down Mouse Up-Down between changes of Pointer to process new option